The situation
An engineering and construction firm working on defense projects needed to meet CMMC Level 2. Leadership assumed the whole organization was in scope. The work involved ITAR-controlled data, which meant GCC High, and the engineering team ran heavy CAD workloads every day.
The challenge
Putting the whole company in GCC High would have been expensive and disruptive. And any enclave had to run CAD at full speed, or the engineers would find ways around it.
What we did
- CUI flow discovery. Over two months we traced where CUI actually entered, moved, and was stored. It touched a defined group of 30 to 50 people, not the whole firm.
- A formal enclave RFQ. We issued a request to qualified GCC High providers, held presentations, and normalized pricing at 30, 40, and 50 seats so the bids compared cleanly.
- CAD performance testing. Each finalist had to show the firm's CAD workloads running on GPU-backed virtual desktops.
The outcome
- The enclave was sized for 30 to 50 users instead of the whole organization.
- The firm chose its provider on performance. The winning bid was not the cheapest. A much cheaper bid could not run the CAD workloads acceptably.
- The firm is on track for a Q2 compliance target, with a scope it can maintain.
The lesson: scope before you shop, and test before you sign. The lowest price is only a saving if your engineers can do their jobs inside the enclave.