Skip to content

Insights

Field notes from the front lines of CMMC — what's changing, what trips teams up, and what readiness actually looks like.

Case StudyCMMC·May 21, 2026

Many programs, one posture: CMMC at an enterprise plastics supplier

Plastics injection molding supplier · ~$400M revenue · ~1,500 employees

A ~$400M injection-molding supplier with multiple programs and a mature IT org didn't lack security — it lacked an audit-ready, repeatable way to prove it. How a GRC operating model tied it together.

Read →
CMMC·May 14, 2026

GCC High, on-prem enclave, or hybrid? Choosing your CUI boundary

Where your CUI lives shapes cost, effort, and how many controls you inherit. A plain-English guide to the three common boundary models — and how to choose.

Read →
CMMC·Apr 9, 2026

Inside a C3PAO assessment: what actually happens

A Level 2 assessment is less mysterious than it sounds. Here's how the days actually unfold — and why the outcome is mostly decided before the assessor arrives.

Read →
Case StudyCMMC·Apr 2, 2026

Multi-site and mid-stream: bringing a mid-market HVAC contractor into scope

Commercial HVAC contractor · ~$60M revenue · ~300 employees

A ~$60M HVAC contractor with several offices and a half-finished compliance effort needed one coherent program — not five. How consolidation and a managed GRC cadence got them there.

Read →
CMMC·Mar 12, 2026

Your SSP and POA&M: evidence, not paperwork

The System Security Plan and POA&M aren't documents you write for the auditor. They're the operating record of your program — and the first thing an assessor reads.

Read →
Case StudyCMMC·Feb 26, 2026

From a single flow-down to audit-ready: a small metal manufacturer

Precision metal manufacturer · ~$8M revenue · ~45 employees

A ~$8M precision machine shop got one CUI flow-down from a prime and no idea where to start. How a lean, enclave-first program got them ready without rebuilding their whole network.

Read →
CMMC·Feb 12, 2026

Three CMMC scoping mistakes that derail audits

Scope is the first decision in a CMMC program and the one most often gotten wrong. Three patterns that quietly inflate cost — and how to avoid them.

Read →
CMMC·Jan 15, 2026

CMMC 2.0, in plain English: what the final rule means now

The CMMC program rule is final and phasing into contracts. Here's what actually changed — and what to do before it lands in your next solicitation.

Read →